July 2001

By 2nd July, the bricklayers were back on site doing the section of the house where we were having brick construction on the ground floor with a timbered construction above. There was a blockwork inner skin and a brickwork outer skin, and we thought their workmanship was superb. Once the ground floor blockwork was nearly complete, the scaffolding went up for the next stage.